Skip to main content
FREE Delivery!|(414) 485-9466

Iowa County, Wisconsin ยท Free Delivery

Bulk Aggregates for Pathways in Ridgeway, WI

Free delivery to Ridgeway on every order, with loads arriving in as fast as 2 business days.

Delivering to Ridgeway, WI

Free delivery on every order.

  • Free delivery to Ridgeway
  • Order from 1 ton
  • As fast as 2 business days

Gravel delivered to Ridgeway

Crushed gravel and base materials that compact under tires.

Rock & Stone delivered to Ridgeway

Graded crushed stone for drainage, concrete and heavy work.

RipRap

4" to 12"+ rock for shorelines, slopes and culvert outlets

From 1 Ton Delivered, FREE to your Doorstep

Cost per ton lowers the more you order!

Free delivery to Ridgeway

Decorative delivered to Ridgeway

Rounded stone for beds, borders and water features.

Sand delivered to Ridgeway

Washed sand for masonry, concrete and leveling.

Soil, Fill & Mulch delivered to Ridgeway

Soil and fill by the ton, mulch by the cubic yard.

How delivery to Ridgeway works

  1. 1

    Pick the material and quantity.Open a product to see your price, with free delivery to Ridgeway.

  2. 2

    Choose a delivery date at checkout.As fast as 2 business days for most Ridgeway addresses.

  3. 3

    Clear a drop spot.The truck tips the load where you mark it. Note low wires or branches when you order.

Not sure how much you need?

Enter length, width and depth and the calculator returns the cubic yards and tons for your project.

Open the calculator

If you are planning a garden path, a walkway to the shed, or a patio base this season, gravel and aggregate delivery in Ridgeway, WI starts with the right fines. Wisconsin Rock Supply sells the materials that lock up tight underfoot, from traffic bond to screenings. Around here the ground is silt loam over shallow bedrock, so what you put on top matters as much as how you dig it.

Materials for Ridgeway Projects

Paths and walkways around Ridgeway need fines in the mix to hold together. Clean stone will not hold a surface. You want material with enough dust and small chips to bind after a few rains and a pass with a plate compactor.

Start with Screenings, sold elsewhere as stone dust or 1/4 inch screenings. Spread about an inch over compacted base and it packs into a surface that sheds a hose and holds a wheelbarrow. It is also the bedding layer under pavers and patio slabs.

For a path that sees foot traffic and the occasional truck, cap it with Walkway Gravel or a thin lift of Driveway Gravel over compacted 3/4" Traffic Bond. Traffic bond is the crushed dense-graded base most Wisconsin yards sell, and here it goes under drives, parking pads and shed floors.

Where a path crosses ground that stays wet, put down Breaker Run first. That coarse crushed stone with fines is the heavy sub-base over soft or clay ground, and you cap it with traffic bond or screenings.

Decorative beds and dry creek beds take River Rock or Large River Rock, and Shredded Mulch handles tree rings and planting beds.

Ground and Conditions in Ridgeway

Watch a thin path base on a slope here after the spring thaw. The silt loam holds water, softens, and the edges rut and pump. That is the failure you are trying to avoid, and it usually traces back to base depth and drainage, not the surface stone.

Ridgeway sits in the Driftless Area and western coulees, where loess sits thin and stony over sandstone and dolomite. Rain and snowmelt run fast off the ridges into narrow valleys, and where the bedrock is shallow, water also moves through cracks and springs.

So build the base deeper than you would on flat, sandy ground. Excavate, compact in lifts, and give the path somewhere to drain. A drainage layer of Drain Rock or 3/4" Crushed Stone under the base keeps water from sitting in the fines.

Frost drives this too. Frost depth runs at least 48 inches for footings under the Uniform Dwelling Code, and 48 to 72 inches under pavement by late winter. A thin base at a hillside seep will rut when frost comes out.

Time the work from the end of the spring thaw into late fall. Wet silty soil on steep grades ruts fast under a loaded truck. Posted county, town and village roads carry spring weight limits while frost comes out, so plan your haul around that.

Delivery to Ridgeway and the Surrounding Area

Order online and pick your quantity by the ton or by the cubic yard. Most homeowners think in yards, most crews think in tons, and the calculator on each product page converts between them so you order close to what you need.

Estimate before you buy. Measure the length, width and depth of the path or pad, then convert. Screenings and traffic bond both compact, so add a little for that. Bulk delivery drops on the driveway or as close to the work as the truck can safely reach.

Wisconsin Rock Supply delivers across Iowa County, including Dodgeville, Mineral Point, Barneveld, Highland and Arena. Have the site clear and the drop spot marked when the truck arrives.

Questions from Ridgeway Buyers

What should I have ready when the truck arrives?

Clear the drop area and mark where you want the pile, with room for the truck to pull out. Know your path or pad dimensions and depth so the load lands in the right spot. If a soft, wet yard or a steep grade is in the way, tell us when you order so we can plan the approach.

What is the best base under pavers in Ridgeway?

Compacted traffic bond is the base, then an inch of screenings for bedding. Dig deeper than flat ground would need, because the silt loam here holds water and softens as frost comes out. Add a drain rock layer where water sits, and compact both lifts before the pavers go down.

Figure Your Yardage, Then Place the Order

Run your path or pad dimensions through the quantity calculator on the product page before you order. It converts tons and yards so you get the right load the first time. When your numbers are ready and the site is marked, Wisconsin Rock Supply will get the material out to your Ridgeway project.

Frequently Asked Questions

Common questions about gravel and aggregate delivery in Ridgeway, WI

What should I have ready when the truck arrives?

Clear the drop area and mark where you want the pile, with room for the truck to pull out. Know your path or pad dimensions and depth so the load lands in the right spot. If a soft, wet yard or a steep grade is in the way, tell us when you order so we can plan the approach.

What is the best base under pavers in Ridgeway?

Compacted traffic bond is the base, then an inch of screenings for bedding. Dig deeper than flat ground would need, because the silt loam here holds water and softens as frost comes out. Add a drain rock layer where water sits, and compact both lifts before the pavers go down.

How is the material measured?

You can order by the ton or by the cubic yard, whichever suits how you plan the job. If you tell us the area you are covering and the depth you want, we will work the quantity out with you rather than leaving you to guess.